DESNZ has published technical guidance to assist UK ETS installation operators in complying with the requirements that relate to the Monitoring and Reporting Regulation 2018 (MRR):
-
UKETS01 MRR: General guidance for installations
-
UKETS04 MRR: Data flow activities and control system, and
-
UKETS07 MRR: Sampling and analysis.
Source: DESNZ.