This table contains a list of each installation’s free allocation for the 2021 to 2025 allocation period.
The following revisions have been made:
– Allocation table updated with amendments to operators allowances as a result of Activity Level Changes.
– The Activity Level Change process for 2021 has now concluded.
– The 2022 Activity Level Change process will begin in July 2022.
Source: BEIS.